water clarifiers

A Limestone Quarry Eliminates Settling Pond to Access Reserve Deposits with a Closed-Loop Clarification System

Company: Glasgow, Inc. Location: King of Prussia, Pennsylvania, USA Challenge: Eliminate settling pond to access material. Return clarified process water for reuse. Treatment: Flocculation & High Compaction Clarifying Thickener Capacity: 1,800 GPM Unit Type: Sump & Slurry Pumps, LQ50, [...]

2023-09-20T18:42:16+00:00June 25th, 2022|Case Studies, Stationary Clarifier Case Studies|Comments Off on A Limestone Quarry Eliminates Settling Pond to Access Reserve Deposits with a Closed-Loop Clarification System

Aggregate Producer Eliminates Need for Settling Ponds with Clarifying Thickener and Polymer System

Client: Tri-County Paving, Inc. Location: Arlington, Wisconsin, USA Challenge: Eliminate settling pond, Increase uptime Treatment: Flocculation & High Compaction Clarifying Thickener Capacity: 1,100 GPM Unit Type: M500PP, AutoFloc Dosing System, CW1400HC Results: 64% w/w mud, 95% clean water for [...]

2023-11-17T15:19:03+00:00May 4th, 2022|Case Studies, Stationary Clarifier Case Studies|Comments Off on Aggregate Producer Eliminates Need for Settling Ponds with Clarifying Thickener and Polymer System

Settling on Sustainability

Cleaning out the settling pond and hauling away the muck was a labor-intensive, season-long drain on the bottom line for Wissota Sand & Gravel – one that owner Christopher Larson was no longer willing to settle for. As such, [...]

2023-12-05T21:43:28+00:00May 3rd, 2022|Articles, Stationary Clarifier Case Studies|Comments Off on Settling on Sustainability

Settling Suspended Solids

The discharge of dirty water from wet screens, sand screws or classifiers has always presented numerous challenges to sand washing operations. While the use of settling ponds is typical, the method unleashes a host of disadvantages. Pond maintenance [...]

2023-11-28T21:59:48+00:00May 3rd, 2022|Articles, Stationary Clarifier Case Studies|Comments Off on Settling Suspended Solids

Complete Wastewater Treatment for a Vegetable Processor with RANC & FBR

Year: 2016 Project Location: Congelados de Navarra in Fustiñana, Navarra, Spain. Objectives: Installation of a wastewater treatment plant that allows compliance with the discharge requirements for a vegetable processing facility. The treatment plant must be flexible and adaptable to [...]

2023-09-20T19:43:04+00:00May 3rd, 2022|Case Studies, DAF Case Studies|Comments Off on Complete Wastewater Treatment for a Vegetable Processor with RANC & FBR

FBR Treatment in the Dairy Processing Industry

Year: 2009 Project Location: Helados Estiu S.A. in Ribarroja, Valencia, Spain. Objective: Removal of organic load from the pre-treated wastewater for discharge of the effluent to the public water network. Adaptation to future needs and expansion of the plant. [...]

2023-12-05T21:47:35+00:00May 1st, 2022|Case Studies, DAF Case Studies|Comments Off on FBR Treatment in the Dairy Processing Industry

Portable Clarifier Protects Valuable Water Resources

In various regions, groundwater resources are in overdraft conditions with declining water levels showing slow-to-no recovery, say reports. At the same time, cities and counties often permit development and growth without considering that water resources barely supply current demands. [...]

2023-09-20T18:46:46+00:00April 21st, 2022|Case Studies, Portable Clarifiers Case Studies|Comments Off on Portable Clarifier Protects Valuable Water Resources

Clarifiers Maximize Geotextile Tube Efficiency

Mechanical dewatering in dredged material management is on the rise. Driving the trend are issues such as high contaminated sediment transportation costs and low space availability at many confined disposal facilities. Clarifiers, or what the industry terms as “thickeners,” [...]

2023-09-20T17:40:03+00:00April 21st, 2022|Articles, Stationary Clarifier Case Studies|Comments Off on Clarifiers Maximize Geotextile Tube Efficiency