coagulation

Sand & Gravel Producer Decreases Settling Pond Footprint and Cleaning Time with Coagulant and Flocculant Dosing

Company: Knife River Location: Boise, Idaho Challenge: Remove solids and unwanted fines from process water for reuse. Reduce settling pond footprint. Decrease pond cleaning time. Treatment: Coagulation and flocculation in settling pond. Capacity: 1,600 GPM Unit Type: LQ50 Liquid [...]

2023-10-30T15:31:54+00:00January 26th, 2023|Case Studies, Polymer Systems|Comments Off on Sand & Gravel Producer Decreases Settling Pond Footprint and Cleaning Time with Coagulant and Flocculant Dosing

A Limestone Quarry Eliminates Settling Pond to Access Reserve Deposits with a Closed-Loop Clarification System

Company: Glasgow, Inc. Location: King of Prussia, Pennsylvania, USA Challenge: Eliminate settling pond to access material. Return clarified process water for reuse. Treatment: Flocculation & High Compaction Clarifying Thickener Capacity: 1,800 GPM Unit Type: Sump & Slurry Pumps, LQ50, [...]

2023-09-20T18:42:16+00:00June 25th, 2022|Case Studies, Stationary Clarifier Case Studies|Comments Off on A Limestone Quarry Eliminates Settling Pond to Access Reserve Deposits with a Closed-Loop Clarification System

Installation of a DAF Clarifier as Part of an FBR Process for the Treatment of Wastewater from the Meat Industry

Year: 2019 Project Location: Cárnicas Medina Facility - Valencia, Spain Objectives: Installation of a secondary clarification system to the existing biological treatment, forming a FBR process to comply with the discharge limits. Installed Technologies: In-line coagulation-flocculation tubes SIGMA PFL-180; clarification [...]

2023-09-20T17:43:48+00:00June 18th, 2022|Case Studies, DAF Case Studies|Comments Off on Installation of a DAF Clarifier as Part of an FBR Process for the Treatment of Wastewater from the Meat Industry

Complete Wastewater Treatment for a Vegetable Processor with RANC & FBR

Year: 2016 Project Location: Congelados de Navarra in Fustiñana, Navarra, Spain. Objectives: Installation of a wastewater treatment plant that allows compliance with the discharge requirements for a vegetable processing facility. The treatment plant must be flexible and adaptable to [...]

2023-09-20T19:43:04+00:00May 3rd, 2022|Case Studies, DAF Case Studies|Comments Off on Complete Wastewater Treatment for a Vegetable Processor with RANC & FBR

FBR Treatment in the Dairy Processing Industry

Year: 2009 Project Location: Helados Estiu S.A. in Ribarroja, Valencia, Spain. Objective: Removal of organic load from the pre-treated wastewater for discharge of the effluent to the public water network. Adaptation to future needs and expansion of the plant. [...]

2023-12-05T21:47:35+00:00May 1st, 2022|Case Studies, DAF Case Studies|Comments Off on FBR Treatment in the Dairy Processing Industry

Reuse of Wastewater in the Cosmetic Industry: Full Treatment Process Applying CAF, DAF, & MBR

Year: 2011 Project Location: Beiersdorf Manufacturing Tres Cantos S.L. - Madrid. Objectives: Design and install a wastewater treatment plant to obtain high-quality water for reuse. Treatment of the sludge generated in the wastewater treatment plant. Installed Equipment: Oils and [...]

2023-09-20T19:35:47+00:00April 19th, 2022|Case Studies, DAF Case Studies|Comments Off on Reuse of Wastewater in the Cosmetic Industry: Full Treatment Process Applying CAF, DAF, & MBR
Go to Top